如何检测汉白玉栏杆破损状况
时间:2017-12-16 09:35:12 点击:次
汉白玉栏杆检测:与裂隙斜交的应变片监测的裂隙位移量大于与裂隙垂直的应变片,且与裂隙斜交的应变片监测的裂隙位移变化幅值稍大于与裂隙垂直的应变片。
The white marble railings detection: crack displacement and strain monitoring of the fractured skew is larger than the vertical crack and strain gauges, and fracture displacement amplitude of strain monitoring and the oblique fissure is slightly larger than the vertical crack and strain gauge.
表明汉白玉栏杆的头部、左后腿的前侧和外侧同样存在着剪切错动的趋势,且错动的位移量要大于张裂的位移量。应变片部分监测数据缺失,但从已监测的时间段内的数据可以看出,其变形规律与其他应变片相同。
汉白玉栏杆
Show that the front and lateral head, left leg white marble railings have a shear trend, and the fault displacement is greater than the dynamic tension displacement. The strain gauge partial monitoring data is missing, but from the monitored time period, it can be seen that the deformation law is the same as that of other strain gages.分析后可以发现,虽然汉白玉栏杆裂隙的位移量随着外界环境的变化处于波动状态,但是随着监测时间的增加,裂隙位移量逐渐表现出一定的规律性。
The analysis can be found, although the displacement of white marble railings fracture with the change of the external environment in a volatile state, but with the increase of monitoring time, fracture displacement gradually show certain regularity.
汉白玉栏杆的损坏是可以追踪的,如汉白玉栏杆裂隙的整体位移量呈现上升趋势,虽然裂隙的日均开合幅度不同,但是裂隙的位移量却随着时间的增加而逐渐增大。
The damaged white marble railings can be monitored, such as the overall displacement of the white marble railings fracture showed a rising trend, although the average crack closing amplitude is different, but the displacement of fracture is increased with the increase of time.